Tags

, , , , , , , , , ,

Our normal Sunday trip now is to visit the Enbridge Aquifer Breach of their Line 3/Line93 Project at the Enbridge Terminal in Clearbrook. This Sunday was no different in that it found more work happening and a growing amount of construction.

This video contains the details on what we witnessed on 10/24/21:

  • New structure over the pump stations to the East end of the work zone.
  • New pipes and weight bags in the area of the breach.
  • Keller Grout silo truck in place as well as a Drill Rig.
  • Excavation at the southeast corner of the Terminal property (which the Strib caught in their drone photo)
Yellow Area is where the new excavation is happening (Strib Photo)